About This Project

SUPERSTRUCTURE FACILITIES

  • Terminal Building Technical Block and Control Tower (Tower Height 32 M)
  • Crash Fire (Fire Department) Station
  • Power (Generator) Center
  • Heavy Equipment Park
  • Heating Plant and Water Reservoir
  • Police Building
  • Airport Guest House with 150 Bed Capacity
  • Regulator Building
  • Entry Control Building
  • 500,00 m Installation Gallery (Sizes 3,00×3.00 m.)
  • Concrete Lined Parking Area for 1000 vehicles
  • Airport Electric- Electronic and Mechanical Installation Systems

INFRASTRUCTURE FACILITIES

  • 3000×60 m Concrete- Paved Runway
  • 240×120 m Concrete- Paved APRON
  • 250 X 30 m Concrete- Paved TAXIWAY
  • 12500 m Perimeter Security Wall and Trellis Fence
  • 8500 m By-Pass
  • 30 Units Perimeter Security Control Towers

Runway + Apron + Taxiway Lighting Systems