Kastamonu Airport Construciton
Category
Completed projects
About This Project
SUPERSTRUCTURE FACILITIES
- Terminal Building
- Technical Block and Flight Control Tower (Tower Height 35 Meters)
- Accident Fire (Fire Department) Building
- Power (Generator) Center
- Heat Center and Water Depot
- Regulator Building
- Access Control Building
- 750.00 mt Plumbing Gallery (3,00 x 3,00 m in scale)
- Asphalt Covered Parking with 500 Vehicles
- Electrical-Electronic and Mechanical Installation Systems of the Airport
INFRASTRUCTURE
- 2250×60 mt. Asphalt Plated PIST
- 120×100 mt. Concrete Coated APRON
- 250×30 mt. Asphalt Coated Accelerating Piston
- 10000 mt. Environmental Safety Wall
- 6000 mt. Ring road
- Runway + Apron + Accelerometer Lighting Systems